top of page

Master Suite Addition in Gaffney, SC

We designed and built a full master suite addition in Gaffney, SC — including structural tie-ins, concrete footings, framing, roofing, electrical, plumbing, and a complete bathroom build-out. This project involved full-scope planning, permitting, and execution from demolition to final finishes.

A newly built addition (and new porch) matching the house style in Gaffney by Campara Construction

Project Details

  • Location: Gaffney, SC

  • Services: Structural addition, framing, concrete, roofing, electrical, plumbing, bathroom finishes

  • Timeline: [14 weeks]

  • Client Goal: Add a private master suite with full bathroom

  • Outcome: Seamless expansion with modern layout, durable materials, and clean finish

Construction Timeline

We completed this project in carefully sequenced stages:

Planning & Permits:

This project began with detailed planning between the homeowner and a structural engineer to ensure the addition met all structural and code requirements. After plan approval and work authorization, we completed a site survey to locate underground utilities before construction began.

Foundation Work

We demolished the existing exterior wall to properly tie the new addition into the original structure. Footings were excavated, reinforced with rebar tied into the existing foundation, and inspected by the city before concrete was pumped and placed. A cinderblock foundation was then constructed, inspected, and fully waterproofed.

Framing & Exterior

Interior and exterior framing was completed to seamlessly connect the new addition to the existing home. Subfloor installation followed, along with framing inspection approval. The structure was wrapped with a vapor barrier, roof sheathing installed, and shingles matched to the existing roof. New windows, doors, brickwork, and a concrete patio extension were completed to blend with the original exterior.

Interior Build‑Out

Electrical and plumbing rough‑ins were completed and inspected before drywall installation. Interior doors were installed, subfloors leveled, and the space prepared for finish work.

Bathroom Construction

The bathroom was built from the ground up, including waterproofing, tile installation, fixture placement, and lighting. Careful attention was given to layout, durability, and long‑term performance.

Final Touches

Hardwood flooring, final tile work, vanities, shower doors, fixtures, lighting, shelving, and hardware were installed. The project concluded with a full cleanup, punch‑list completion, and final paint touch‑ups.

Foundation of a new addition built by Campara Construction
Exterior housewrap started after framing in Gaffney, SC

Each phase of this project was carefully sequenced to ensure structural integrity, code compliance, and a seamless connection between the existing home and the new addition. From planning through final finishes, the work was completed with attention to detail at every stage.

Video Walkthrough

The video below highlights key stages of the master suite addition, including structural framing, subfloor installation, and layout planning. These clips show real construction work as it happened on site in Gaffney, SC. The short video below is specifically for framing and tying floors of a master suite addition.

Floor Framing for Master Suite Addition

Floor Framing for Master Suite Addition

Vapor barrier and exterior wrap installation

Vapor barrier and exterior wrap installation

Drywall hanging and interior preparation

Drywall hanging and interior preparation

Tiling installation during bathroom construction

Tiling installation during bathroom construction
windows added to addition, brick work started in Gaffney

Building a concrete foundation by our crew

Building a concrete foundation by our crew
Final phase of brick laying in Gaffney by Campara Construction crew

Bathroom Finish

This bathroom was completed as part of the master suite addition and built from the ground up. The layout was designed for long‑term durability and everyday use, with careful attention to waterproofing, tile installation, lighting, and fixture placement.

Image 1 - During Construction (early phase), Image 2 - During Construction (tile installation)

Area (before picture) the shower was built in Gaffney, South Carolina
Campara Construction craftsman laying tiles for a shower in Gaffney, SC

Image 3 - During Construction (later phase), Image 4 - During Construction (completed))

during a shower tile installation by Campara Construction employees
Niche and tile design built by Campara Construction
Finished bathroom featuring a glass‑enclosed shower, built‑in bench, modern vanity, and updated lighting.

Finished bathroom featuring a glass‑enclosed shower, built‑in bench, modern vanity, and updated lighting.

Final Outcome

The completed master suite addition blends seamlessly with the existing home, both structurally and visually. The new space provides a private bedroom and full bathroom designed for long‑term use, with durable materials, clean finishes, and a layout that improves overall flow.

From foundation work through final paint touch‑ups, each phase was completed with attention to detail and coordination with required inspections. The result is a well‑integrated addition that expands the home while maintaining consistency with the original structure.

Additional project photos and renovation work can be viewed on our Projects page.

Related Services

This project reflects the type of renovation and construction work we provide across several service areas:

  • Bathroom Remodeling

  • Home Additions (service page coming soon)

  • Structural Renovations

  • Interior Remodeling 

  • Kitchen Remodeling

Contact us

Let's Talk 🙃

bottom of page